The Middle Asia Gas Pipeline AB Line and C Line
The Middle Asia gas pipeline project is the project with great significance to our national strategy. It is China’s frst gas energy transnational artery introduced from abroad.
Our company has transported 1890 kilometers pipelines for the AB line of the project which in total took 32,067 domestic wagons and 22,711 foreign wagons as well as 12,233 trucks.
The C line is the 2nd phase of the Middle Asia gas pipeline project after the AB line. The C line is 1833 kilometers from Turkmenistan to China’s Khorgas by the way of Uzbekistan and Kazakhstan and it is
parallel to the AB line. Our company undertook the 611 kilometers pipeline transportation which was cumulatively 11,228 trucks for the C line.